CONTOOCOOK RAILROAD MUSEUM
  • Home
  • About Us
    • Our Organization >
      • The CRA
      • Covered Bridge Model
      • Membership
      • Recent Projects >
        • Brick Patio
        • Depot Insulation Project
        • Semaphore Mast Replacement
        • B&M Section House
        • Mini-Split System
      • Documents >
        • Meeting Minutes & Documents
    • Support >
      • Give
      • Support Projects
      • Save the Coach
    • Our Friends
  • History
    • The Depot
    • The Coach
    • The Bridge
    • The Section House
    • Media
  • Events
    • Christmas at the Depot
    • Dinner for the Coach
    • Model Railroad Show
  • Gift Shop
  • Visit
  • Contact

Semaphore Mast Replacement Project

​What is a semaphore?
The semaphore, or signal mast, is the apparatus atop the depot that was once used for signaling information to oncoming railroad vehicles. The semaphore mast is the large wooden timber that extends beyond the roof-line of our depot. This mast holds the signaling mechanics and lantern.

Why is ours being replaced?
After many years of serving its purpose, our semaphore has fallen victim to significant weather and rot damage. Our semaphore is constructed of wood timber and after over a century of being exposed to the elements, we have determined that the risk of failure is too great to ignore. 
​
Picture
What will the work consist of?
Phase One: We will begin work to remove the mechanical and electrical components. Once the parts are removed from the mast, they will be stored and will undergo proper restoration work. COMPLETED - Fall 2018

Phase Two: We will work with a local crane operator (Reen's Towing) to hoist out the old mast. We will take accurate measurements of the existing mast and have a new mast hewn to the appropriate size. We will prepare the new mast by measuring and pre-drilling for all the mechanical components of the semaphore. COMPLETED - May 19, 2019

Phase Three: Selecting the new mast will take some time. The new mast will come from a fresh cut piece of hard-wood timber. The tree will need to be located by the mill and cut to size after drying for a couple of seasons. COMPLETED - October 19, 2020

Phase Four: Once the new mast is cut and retrieved, we will hoist and set the mast through the roof and reattach to the depot. We will then reassemble the mechanical and electrical components to be in working order. Once the project is complete, the semaphore "signal" will work properly and allow train orders to be carried from inside the stationmaster's office by hand.

Wish to contribute to this project? Click here.


Picture
Picture
Picture
Picture
A 501(c)3 non-profit organization
Copyright © 2021 Contoocook Riverway Association. | Site Map
Website created and managed by Steve Lux | Privacy Policy
Visit: Contoocook & Hopkinton
  • Home
  • About Us
    • Our Organization >
      • The CRA
      • Covered Bridge Model
      • Membership
      • Recent Projects >
        • Brick Patio
        • Depot Insulation Project
        • Semaphore Mast Replacement
        • B&M Section House
        • Mini-Split System
      • Documents >
        • Meeting Minutes & Documents
    • Support >
      • Give
      • Support Projects
      • Save the Coach
    • Our Friends
  • History
    • The Depot
    • The Coach
    • The Bridge
    • The Section House
    • Media
  • Events
    • Christmas at the Depot
    • Dinner for the Coach
    • Model Railroad Show
  • Gift Shop
  • Visit
  • Contact